Update: Lower than usual water pressure from Islington Avenue to Milvan Drive (July 5, 2022– August 15, 2022)

Update: Lower than usual water pressure from Islington Avenue to Milvan Drive (July 5, 2022– August 15, 2022)

LOCATION

  • Between Islington Avenue and Milvan Drive

IMPACT

  • Businesses and households may experience lower than usual water pressure

TIMING

  • July 5, 2022-August 15, 2022, approximately
  • Work hours from 7 a.m. to 5 p.m.

WORK DESCRIPTION

  • Rebuilding and relocating wet utilities along Finch Avenue West.
  • Transmission main isolation

Detail Description

As part of the Finch West LRT Project, crews are relocating wet utilities in the vicinity of Finch Avenue West between Islington Avenue and Milvan Drive. To perform part of this work, an isolation of a water main is scheduled to start on July 5, 2022, for two months, approximately. Interruption to water supply is not anticipated, however, during this event customers in the area shown above may experience lower than usual water pressure.

WHAT TO EXPECT:

  • Watermain isolation scheduled from July 5, 2022, until August 15, 2022.

PEDESTRIAN, TRAFFIC AND TRANSIT DETAILS:

  • Tuesday, July 5 starting at 9:00 am until Monday, August 15 at 3:00 pm, approximately.
  • Unexpected circumstances (weather, equipment failure, etc.) may also change the above interruption plans or prolong the interruption.